Go top
Project information

Evaluation of K-factor calculation procedure

L. Rouco I. Egido L. Sigrist

September 2025 - April 2026

Funding entity European Network of Transmission System Operators for Electricity (ENTSO-e)


The aim of the collaboration is to perform an investigation on the methods to determine the K-factor of a frequency regulation area. The variations of the K-factor taking place in the Continental European system will also be addressed.


ENTSO-E-K-FACTOR